US Pentagon ReconstructionEDG2 served as a prime MEP consultant for the Pentagon re-build project after September 11th 2001. The project involved over 1.6 million sf of re-build space which included 400,000 sf of new building. Working with the Pentagon, AMEC, Allyn Kilshimer of KCE and other team members the building was completed and ready of occupancy by September 11, 2002
|
Internal Revenue Service (IRS) HeadquartersMEP design for the three building campus headquarters for the Internal Revenue Service encompasses 1.2 Million sf and was constructed in an aggressive design-build format. EDG2 was responsible for mechanical and electrical systems design of interior office and support space throughout the three-building complex and a 1,680 car, six level parking structure.
PROJECT SUMMARY
|
US Department of the TreasuryMEP Design for the modernization and re-engineering of full mechanical and electrical systems in the nation’s oldest federal office building. Converting this historic structure into a state-of-the-art office building required a comprehensive upgrade of the electrical system, including the introduction of new diesel generators, integration of two new uninterruptible power supply systems and related support equipment. Improvement of the HVAC system included the replacement of existing chillers, the installation of cooling towers and new air-handling units. An innovative fire suppression and alarm system was also designed and implemented. To minimize disruption to existing workplaces, all designs were configured for phased construction.
|