EDG2
  • Home
  • About Us
  • Services
  • Markets
  • Contact
  • Careers
  • News

Picture

Portals Office Complex

EDG2 designed the complete mechanical and electrical systems of the base building and all tenant space in this 1 million sf complex.  

Infrastructure designs provide for the development of a leading-edge data center, as well.  Data center electrical infrastructure designs were engineered to include a “system plus system” redundant uninterruptible power supply system and standby power generation plant.   The future complex will accommodate three additional office buildings and a hotel.

PROJECT SUMMARY  
  • $67 Million in construction cost
  • 1 million sf complex 
  • Four-building campus
  • Sophisticated indoor air quality monitoring system
Picture

Irvington Center King Farm Buildings 1, 2, 3, 4 & 8

Fast-track design services for five buildings that in the future will have a campus of 13 buildings, the current buildings range in size from 200,000 to 300,000 sf.  The typical designs include tenant fit-outs, health/fitness areas, conference centers, restaurant retail space and parking garages.  

Each building is designed to be connected to a “campus” type overall central energy management system that allows the manager to monitor and control all building functions.  The building uses a direct digital controlled fan powered variable air volume system with floor-by-floor air conditioning units connected to a roof mounted pumping and heat injection system.  

PROJECT SUMMARY  
  • $50 Million per building in construction cost
  • Buildings ranging from 200,000 to 300,000 SF
  • Mixed-use
  • Design-build  
Picture

Time Warner Building​

EDG completed major infrastructure improvements to this landmark. Improvements included a 2,700 ton chiller plant for replacement and increased capacity, new service distribution switchboards of 4,000 ampere capacity each, completion of a new fire protection systems with complete sprinkler protection, and a new addressable multiplex fire alarm and communication system.
    
Additional projects in the building included a new corporate computer system and telephone equipment rooms with redundant UPS air conditioning systems.  A new 75 person viewing theatre was designed with project room for previewing new Warner Brothers movie releases.

PROJECT SUMMARY  
  • ​$10 Million in construction cost
  • Landmark building
  • 2,700 Ton chiller plant
  • New theater for previewing Warner Brothers movie releases
ISO 9001:2015 ​Certified
202.466.2222
Copyright © 2019 EDG2 All Rights Reserved